People may search for a “house from a developer near Kyiv”, but a real transaction depends on the identified seller, registered owner of the house and land, and the contractor that performed the work.

Who is involved at GREENBOR

The four completed duplexes are sold by their private individual owners. The project owners organised construction, while the PNV Construction Group performed the building work.

Documents and warranties

Before signing, verify title, cadastral number, technical specification and payment procedure. Warranty periods and the precise covered work are defined in the individual agreement for the selected property.

Quick checklist

  • distinguish the brand, seller and construction contractor
  • confirm the actual specification included in the price
  • review the draft agreement before making a final decision

The current GREENBOR model

As of the update date, only four completed Phase 1 duplexes are open for sale: 2-Е, 2-И, 2-Ж and 2-К. The Phase 1 townhouse is under construction and may be viewed or reserved free of charge without any payment. Phase 2 remains a design-stage concept; a free reservation is possible without payment or price fixing.

The headline figure for a completed duplex is the total acquisition budget. The breakdown separately shows the house-and-land price and the targeted infrastructure contribution to ОК «Грінбор», equivalent to USD 6,000. The contribution is paid in UAH by official bank transfer at the calculation rate set by ОК «Грінбор» on the payment date.

Membership is voluntary under law; however, joining and paying the established contribution are conditions on which the completed-duplex owners agree to sell. The cooperative legally owns shared infrastructure, while each household receives usage rights and one vote.

Addresses, engineering systems and warranties

References such as 2-Е, 2-И, 2-Ж and 2-К are used for internal project navigation. They do not establish an official postal address; the title documents for the selected house and land plot control.

The community uses a local wastewater management system rather than a municipal central sewer connection. Before buying, confirm connection points, metering arrangements and the responsibility boundary between private and cooperative parts of the system.

The individual agreement provides 10 years for structural elements, 3 years for engineering systems installed by PNVTEAM and 1 year for finishing work completed by PNVTEAM. The selected-property agreement defines scope, exclusions, claim procedure and commencement date.

Frequently asked questions

Can a completed duplex be reserved?

The completed duplexes are open for sale and viewing. The parties document any agreed process for recording purchase intent for the selected home.

Does GREENBOR accept money for the townhouse or Phase 2?

No. Those categories allow only a free reservation, without payment and without fixing a price.

Where is the current price shown?

Each completed-duplex page shows the total budget, its components, the calculation rate and the effective date.

Useful links

This article is general information, not individual legal or tax advice. Final rights, payments, warranties and dates are defined by the documents and individual agreement for the selected property.