GREENBOR residential community
 
Greenbor
RESIDENTIAL COMMUNITY
IN ZELENYI BIR
UAENRU

GREENBOR Phase 2 townhouses are presented as a future-development concept on Petra Doroshenka Street in the village of Zelenyi Bir.

The objects are at the stage of project preparation before the start of construction work. Phase 2 includes five independent homes with their own entrances, private backyards, separate legally registered land plots and individual resource metering.

Four standard units have a project area of 103.2 m². The enlarged central unit 1-В has three levels and a project area of 140.2 m².

The buildings of Phase 2 are being prepared for the start of construction works (project preparation is ongoing). The standard installment plan for Phase 2 is currently not open. Only free reservation under a Reservation Agreement is available.

Find the townhouse on the plan · Submit a free reservation · Read the GREENBOR rules

Homes

Phase 2 townhouse unit 1-А Phase 2 Free reservation

Phase 2 townhouse unit 1-А

Zelenyi Bir, Fastiv District, Petra Doroshenka Street
*
1-А is an internal project reference used for navigation. The official address and specifications will be defined by the title documents and may differ.
103.20 m² 2.34 ares
Free reservationSales are not open — no funds are accepted
Phase 2 townhouse unit 1-Б Phase 2 Free reservation

Phase 2 townhouse unit 1-Б

Zelenyi Bir, Fastiv District, Petra Doroshenka Street
*
1-Б is an internal project reference used for navigation. The official address and specifications will be defined by the title documents and may differ.
103.20 m² 1.65 ares
Free reservationSales are not open — no funds are accepted
Phase 2 townhouse unit 1-Д Phase 2 Free reservation

Phase 2 townhouse unit 1-Д

Zelenyi Bir, Fastiv District, Petra Doroshenka Street
*
1-Д is an internal project reference used for navigation. The official address and specifications will be defined by the title documents and may differ.
103.20 m² 2.21 ares
Free reservationSales are not open — no funds are accepted
Phase 2 townhouse unit 1-Г Phase 2 Free reservation

Phase 2 townhouse unit 1-Г

Zelenyi Bir, Fastiv District, Petra Doroshenka Street
*
1-Г is an internal project reference used for navigation. The official address and specifications will be defined by the title documents and may differ.
103.20 m² 1.67 ares
Free reservationSales are not open — no funds are accepted
Phase 2 townhouse unit 1-В Phase 2 Free reservation

Phase 2 townhouse unit 1-В

Zelenyi Bir, Fastiv District, Petra Doroshenka Street
*
1-В is an internal project reference used for navigation. The official address and specifications will be defined by the title documents and may differ.
140.20 m² 1.67 ares
Free reservationSales are not open — no funds are accepted

One townhouse building comprising five residential units of Phase 2

  • Petra Doroshenka Street, 1-А — standard unit, land plot 234 m²;
  • Petra Doroshenka Street, 1-Б — standard unit, land plot 165 m²;
  • Petra Doroshenka Street, 1-В — enlarged central unit, land plot 167 m²;
  • Petra Doroshenka Street, 1-Г — standard unit, land plot 167 m²;
  • Petra Doroshenka Street, 1-Д — standard unit, land plot 221 m².

Each unit is a separate household with its own address / internal project reference, land plot with cadastral number, private yard and individual connections to the community’s utility systems.

Current project characteristics, cadastral number, layout, future equipment and availability for reservation request are indicated in the card of the specific object.

Standard units with an area of 103.2 m²

Townhouse units 1-А, 1-Б, 1-Г and 1-Д are designed as two-storey houses for permanent comfortable family living.

Project layout involves:

  • a spacious kitchen-living room with access to a private yard;
  • three separate living rooms;
  • two bathrooms;
  • two main living floors;
  • auxiliary and technical areas;
  • attic space.

The exact configuration of the premises and the dimensions of the rooms are determined by the actual project layout of a specific unit.

Please note: the project area is a guideline for construction. The actual characteristics will be determined based on the results of the BTI control measurement after the construction works are completed and the facility is put into operation.

Enlarged central unit 1-В (140.2 m²)

Central unit 1-В differs from standard townhouse units in its three-level structure and expanded project area of 140.2 m².

The additional third level can be effectively used for:

  • master bedroom or separate living room;
  • personal office;
  • play or children’s area;
  • lounge space for relaxation;
  • utility and wardrobe rooms.

The final purpose of the premises, structural solutions and engineering equipment are agreed upon according to the actual project of the object.

Current status: concept and project preparation

Phase 2 remains at the concept and project-preparation stage. Construction and property sales have not started.

The layouts, areas, locations and engineering solutions shown are preliminary and may be refined.

Only a free reservation may be submitted. It does not fix a house or unit, land plot, price, configuration or timeline, and no funds are accepted.

Separate plot of land and private yard

Each townhouse unit corresponds to a separate legally registered land plot with its own cadastral number.

The entrance to the house faces the interior of GREENBOR, and the main private space of the family is located towards the backyard.

Depending on the area and configuration of the plot, here you can arrange:

  • open or closed terrace;
  • lawn, flower beds and automatic irrigation system;
  • children’s or family recreation area;
  • additional paving;
  • carport.

At least one personal parking space is provided for each household. Additional arrangement of the private plot is ordered separately.

Open space in front of entrances

One of the key features of GREENBOR is the open interior space in front of the façades and entrance doors of the townhouse units.

The outer perimeter of the community is closed to outsiders, but the area in front of the houses is not divided by a continuous system of high fences.

The concept does not involve arbitrary installation in the common area of:

  • fences and partitions between entrances;
  • personal gates or pedestrian gates;
  • barriers;
  • constructions that block the road or passage;
  • outbuildings and sheds outside the private lot.

Privacy is provided by one’s own house and private backyard area.

Read the GREENBOR Statute and Rules

Design and materials

The approved architectural concept of GREENBOR townhouses provides:

  • reinforced-concrete foundation according to the project;
  • external walls made of StoneLight (D500) aerated-concrete block 375 mm thick;
  • internal brick partitions;
  • reinforced-concrete and wooden floor structures;
  • metal profiled roof with water and vapour insulation;
  • clinker façade decoration;
  • gravity ventilation;
  • individual grounding circuit.

Electricity supply and ASKOE

The project provides up to 15 kW of three-phase electric power for each Phase 2 townhouse unit.

At the entrance to the land plot a separate cabinet meter integrated into the general ASKOE system with support for a two-zone tariff (day/night) will be installed.

Common equipment of the community has separate metering groups (artesian wells, lighting, automatic gates, video surveillance).

Gasification in the community is not provided. The buildings are designed for efficient electric heating systems.

Domestic water supply

Each townhouse unit has a separate domestic-water line from the utility room.

A two-circuit consumption metering system is used (a control meter in the technical room and an individual meter in the house), which makes it possible to detect possible leaks.

Together with the development of Phase 2 the construction of the third artesian well with a design capacity of about 7 m³/h is foreseen.

Separate technical water for the plot

A separate technical-water line for irrigation and household needs is connected to each land plot.

Water is supplied to an external connection point outside the house, has its own meter and is paid for separately, without including this volume in the wastewater-management services.

Wastewater management and storm drainage

For Phase 2 townhouse units a connection to the shared on-site wastewater management system is provided.

Wastewater-management costs are calculated strictly in proportion to the volume of domestic water consumed. Rainwater and meltwater are drained through a separate drainage system.

Optical internet

A fibre-optic internet line (FTTH) with redundant power supply of the provider’s nodes is projected to the Phase 2 townhouse units.

Development of the territory of Phase 2

In parallel with the construction of houses the development of the territory of Phase 2 is planned:

  • second vehicular entrance and second pedestrian gate;
  • third artesian well;
  • extension of internal road and street lighting;
  • expansion of the video-surveillance system;
  • guest parking on the street side;
  • walking route 200 metres long;
  • children’s playground, workout area, gazebo with barbecue;
  • equipped shelter for residents of the community;
  • critical-infrastructure backup power.

During the period of active works Phase 2 is separated by a temporary fence for the safety and comfort of the residents of Phase 1.

More about infrastructure and utilities

Walking route and recreation areas

The completed GREENBOR project includes a 200-metre circular walking route that will run along the internal road, behind the townhouses, near the playground and gazebo.

GREENBOR walking route · Gazebo and seating area

Free reservation

A request lets you express interest in the concept and receive updates about its development.

  • the reservation request itself is not a reservation, pre-contract or order; a separate free Reservation Agreement may be offered;
  • a specific home or place in the queue, layout or plot may be identified only by a separate free Reservation Agreement;
  • the price is not fixed; any reserved layout, plot or place in the queue may be adjusted before sales begin without penalties;
  • no deposit, advance or other funds are accepted.

Any future legal and commercial terms will be communicated separately after the required readiness is reached.

Submit a free reservation

What will be included in the cost of the object

After completion of construction and transfer of the object the buyer receives:

  • townhouse unit with completed capital structures and roof;
  • a separately legally registered land plot with a cadastral number;
  • connected engineering networks (electricity up to 15 kW, domestic water, technical water, wastewater management);
  • the right to use the shared GREENBOR infrastructure through cooperative membership after it is commissioned;
  • complete set directly specified in the contract.

Construction, quality control and contractual warranty

Construction work is carried out by the team of PNV Construction Group.

Quality control is carried out by an independent company Construction Audit.

The principle of a 10-year warranty is incorporated into the individual contract for the specific property. The contract defines the structures, works and equipment covered, together with the applicable warranty terms.

Frequently Asked Questions (FAQ)

How many townhouse units are planned in Phase 2?

Five separate units: 1-А, 1-Б, 1-В, 1-Г and 1-Д.

What stage is the construction at?

The objects are at the stage of project preparation before the start of construction work and are presented as a future-development concept.

What is the area of standard units and what is different about unit 1-В?

Standard units (1-А, 1-Б, 1-Г, 1-Д) have a project area of 103.2 m² (2 floors). Unit 1-В is an enlarged three-level unit with an area of 140.2 m².

Do the units have separate plots of land?

Yes. Each townhouse unit corresponds to a separate legally registered land plot with its own cadastral number.

Is the installment plan open for Phase 2?

Installments are not open for Phase 2. Only a free reservation is available; no funds are accepted and no price or other terms are fixed.

All GREENBOR homes · Phase 2 duplexes and triplex · Master plan · Engineering systems · GREENBOR Rules · Submit a free reservation

The GREENBOR website is an informational portal about the residential community. Townhouses of Phase 2 are at the design and preparation stage. Land owners or persons authorized by them may post announcements about the future sale of specific objects. The information on the page does not constitute a public offer.