Stage 2
Free expression of interest
GREENBOR Phase 2 townhouses are presented as a future-development concept on Petro Doroshenko Street in the village of Zelenyi Bir.
The objects are at the stage of project preparation before the start of construction work. In the second row, there are five independent homes with their own entrances, private backyards, separate formed plots of land and individual resource accounting.
Four standard sections have a project area of 103.2 m². The enlarged central townhouse 1-В has three levels and a project area of 140.2 m².
The buildings of the second phase are being prepared for the start of construction works (project preparation is ongoing). The standard installment plan for the second stage is currently not open.
Find the townhouse on the plan · Submit a free information request · Read the GREENBOR rules
Homes
Stage 2
Free expression of interest
Stage 2
Free expression of interest
Townhouse Petro Doroshenko Street 1-Б
*
Stage 2
Free expression of interest
Townhouse Petro Doroshenko Street 1-Д
*
Stage 2
Free expression of interest
Townhouse Petro Doroshenko Street 1-Г
*
Stage 2
Free expression of interest
Townhouse Petro Doroshenko Street 1-В
*
Five townhouses of the second phase
- str. Petra Doroshenko, 1A — standard section, land plot 234 m²;
- str. Petra Doroshenko, 1B — standard section, land plot 165 m²;
- street Petra Doroshenko, 1V — enlarged central section, land plot 167 m²;
- str. Petra Doroshenko, 1G — standard section, land plot 167 m²;
- str. Petra Doroshenko, 1D — standard section, land plot 221 m².
Each section is a separate homestead with its own address, plot of land with cadastral number, private yard and individual connections to the block's utility systems.
Current project characteristics, cadastral number, layout, future equipment and availability for information request are indicated in the card of the specific object.
Standard sections with an area of 103.2 m²
Townhouses 1A, 1B, 1G and 1D are designed as two-story houses for permanent comfortable family living.
Project planning involves:
- a spacious kitchen-living room with access to a private yard;
- three separate living rooms;
- two bathrooms;
- two main living floors;
- auxiliary and technical areas;
- attic space.
The exact configuration of the premises and the dimensions of the rooms are determined by the actual project planning of a specific section.
Please note: the project area is a guideline for construction. The actual characteristics will be determined based on the results of the BTI control measurement after the construction works are completed and the facility is put into operation.
Enlarged central townhouse 1-В (140.2 m²)
Central section 1-В differs from standard townhouses in its three-level structure and expanded project area of 140.2 m².
The additional third level can be effectively used for:
- master bedroom or separate living room;
- personal office;
- play or children's area;
- lounge space for relaxation;
- utility and wardrobe rooms.
The final purpose of the premises, structural solutions and engineering equipment are agreed upon according to the actual project of the object.
Current status: concept and project preparation
Phase 2 remains at the concept and project-preparation stage. Construction and property sales have not started.
The layouts, areas, locations and engineering solutions shown are preliminary and may be refined.
Only a free information request may be submitted. It does not fix a house or unit, land plot, price, configuration or timeline, and no funds are accepted.
Separate plot of land and private yard
Each townhouse corresponds to a separate formed plot of land with its own cadastral number.
The entrance to the house faces the interior of GREENBOR, and the main private space of the family is located towards the backyard.
Depending on the area and configuration of the plot, here you can predict:
- open or closed terrace;
- lawn, flower beds and automatic irrigation system;
- children's or family recreation area;
- additional paving;
- carport.
At least one personal parking space is provided for each household. Additional arrangement of the private plot is ordered separately.
Open space in front of entrances
One of the key features of GREENBOR is the open interior space in front of the facades and entrance doors of the townhouses.
The outer perimeter of the block is closed to outsiders, but the area in front of the houses is not divided by a continuous system of high fences.
The concept does not involve arbitrary installation in the common area:
- fences and partitions between entrances;
- personal gates or wickets;
- barriers;
- constructions blocking the road or passage;
- outbuildings and sheds outside the private lot.
Privacy is provided by own house and private backyard area.
Read the GREENBOR Statute and Rules
Design designs and materials
The approved architectural concept of GREENBOR townhouses provides:
- reinforced concrete foundation according to the estimated project;
- external walls made of StoneLight (D500) gas block 375 mm thick;
- internal brick partitions;
- reinforced concrete and wooden floor structures;
- metal profiled roof with water and vapor insulation;
- clinker/facade decoration;
- gravity ventilation;
- individual ground circuit.
Electricity supply and ASKOE
The project provides up to 15 kW of three-phase electric power for each townhouse of the second phase.
At the entrance to the land plot, a separate cabinet meter integrated into the general ASKOE system with support for a two-zone tariff (day/night) will be installed.
Common equipment of the quarter has separate accounting groups (artesian wells, lighting, automatic gates, video surveillance).
Gasification in the quarter is not provided. The buildings are designed for efficient electric heating systems.
Household water supply
Each townhouse has a separate domestic water line from the utility room.
A two-stage consumption accounting system is used (a control meter in the technical room and an individual meter in the house), which makes it possible to detect possible leaks.
Together with the development of the second phase, the construction of the third artesian well with a design capacity of about 7 m³/h is foreseen.
Separate technical water for the site
A separate technical water line for irrigation and household needs is connected to each plot of land.
Water is supplied to an external connection point outside the house, has its own meter and is paid for separately, without including this volume in the drainage services.
Drainage and storm drainage
For townhouses of the second phase, a connection to the intra-quarter autonomous drainage system is provided.
Drainage costs are calculated strictly in proportion to the amount of domestic water consumed. Rainwater and meltwater are drained through a separate drainage system.
Optical Internet
A fiber-optic Internet line (FTTH) with redundant power supply of the provider's nodes is projected to the townhouses of the second phase.
Development of the territory of the second stage
In parallel with the construction of houses, the development of the territory of the second phase is planned:
- second vehicular entrance and second pedestrian gate;
- third artesian well;
- extension of internal road and street lighting;
- expansion of the video surveillance system;
- guest parking on the street side;
- walking route 200 meters long;
- playground, workout area, gazebo with barbecue;
- equipped shelter for residents of the block;
- critical infrastructure backup power.
During the period of active works, the second row is separated by a temporary fence for the safety and comfort of the residents of the first row.
More about infrastructure and utilities
Walking route and recreation areas
The completed GREENBOR project includes a 200-meter circular walking route that will run along the internal road, behind the townhouses, near the playground and gazebo.
GREENBOR Walking Path · Gazebo and seating area
Free information request
A request lets you express interest in the concept and receive updates about its development.
- the information request itself is not a reservation, pre-contract or order; a separate free reservation agreement may be offered;
- a specific home or place in the queue, layout or plot may be identified only by a separate free reservation agreement;
- the price is not fixed; any reserved layout, plot or place in the queue may be adjusted before sales begin without penalties;
- no deposit, advance or other funds are accepted.
Any future legal and commercial terms will be communicated separately after the required readiness is reached.
Submit a free information request
What will be included in the cost of the object
After completion of construction and transfer of the object to the buyer are transferred:
- section of a townhouse with completed capital structures and roof;
- a separately formed land plot with a cadastral number;
- connected engineering networks (electricity up to 15 kW, domestic water, technical water, drainage);
- the right to use the shared GREENBOR infrastructure through cooperative membership after it is commissioned;
- complete set, directly specified in the contract.
Construction, quality control and 10 year warranty
Construction work is carried out by a team Construction Group PNV.
Quality control is carried out by an independent company Construction Audit.
The principle of a 10-year warranty is incorporated into the individual contract for the specific property. The contract defines the structures, works and equipment covered, together with the applicable warranty terms.
Frequently Asked Questions (FAQ)
How many townhouses are planned in the second row?
Five separate sections: 1A, 1B, 1B, 1D and 1D.
What stage is the construction at?
The objects are at the stage of project preparation before the start of construction work and are presented as a future-development concept.
What is the area of standard sections and what is different about townhouse 1-В?
Standard sections (1A, 1B, 1H, 1D) have a project area of 103.2 m² (2 floors). Section 1-В is an enlarged three-level section with an area of 140.2 m².
Do the sections have separate plots of land?
Yes. Each townhouse corresponds to a separate formed plot of land with its own cadastral number.
Is the second installment open?
Installments are not open for Phase 2. Only a free information request is available; no funds are accepted and no price or other terms are fixed.
All GREENBOR houses · Phase 2 duplexes and triplexes · Quarter plan · Engineering systems · GREENBOR Rules · Leave a request
The GREENBOR site is an information portal about the residential quarter. Townhouses of the second phase are at the design and preparation stage. Land owners or persons authorized by them may post announcements about the future sale of specific objects. The information on the page is not a public offer.
