An instalment plan is useful only when the buyer understands the total budget, legal status and timing of title transfer—not just the monthly payment.

GREENBOR instalment parameters

The owners offer individually agreed instalments for the four completed Phase 1 duplexes: a down payment from 40%, a term of up to 12 months and an agreed payment schedule. The selected property agreement contains the final terms.

What is outside the schedule

The targeted infrastructure contribution to ОК «Грінбор» is not part of the house instalment plan. It is paid separately by official bank transfer in UAH at the calculation rate set by ОК «Грінбор» on the payment date.

Quick checklist

  • confirm the deposit and payment dates
  • define handover and title-registration timing
  • budget separately for the contribution and transaction costs

The current GREENBOR model

As of the update date, only four completed Phase 1 duplexes are open for sale: 2-Е, 2-И, 2-Ж and 2-К. The Phase 1 townhouse is under construction and may be viewed or reserved free of charge without any payment. Phase 2 remains a design-stage concept; a free reservation is possible without payment or price fixing.

The headline figure for a completed duplex is the total acquisition budget. The breakdown separately shows the house-and-land price and the targeted infrastructure contribution to ОК «Грінбор», equivalent to USD 6,000. The contribution is paid in UAH by official bank transfer at the calculation rate set by ОК «Грінбор» on the payment date.

Membership is voluntary under law; however, joining and paying the established contribution are conditions on which the completed-duplex owners agree to sell. The cooperative legally owns shared infrastructure, while each household receives usage rights and one vote.

Addresses, engineering systems and warranties

References such as 2-Е, 2-И, 2-Ж and 2-К are used for internal project navigation. They do not establish an official postal address; the title documents for the selected house and land plot control.

The community uses a local wastewater management system rather than a municipal central sewer connection. Before buying, confirm connection points, metering arrangements and the responsibility boundary between private and cooperative parts of the system.

The individual agreement provides 10 years for structural elements, 3 years for engineering systems installed by PNVTEAM and 1 year for finishing work completed by PNVTEAM. The selected-property agreement defines scope, exclusions, claim procedure and commencement date.

Frequently asked questions

Can a completed duplex be reserved?

The completed duplexes are open for sale and viewing. The parties document any agreed process for recording purchase intent for the selected home.

Does GREENBOR accept money for the townhouse or Phase 2?

No. Those categories allow only a free reservation, without payment and without fixing a price.

Where is the current price shown?

Each completed-duplex page shows the total budget, its components, the calculation rate and the effective date.

Useful links

This article is general information, not individual legal or tax advice. Final rights, payments, warranties and dates are defined by the documents and individual agreement for the selected property.