Townhouse at street Ivan Bohun, 2-А is a first phase house under construction, available for a construction-progress viewing; sale, paid reservation and payments are not available until legal readiness. The area of ​​the house is 103.2 m², the area of ​​a separate plot of land is 247 m².

A construction-progress viewing lets you inspect the unit, land plot and planned specification. Sale, paid reservation and payments are not available until legal readiness.

Features of the object Ivan Bohun Street, 2-А

Townhouse under construction with the largest lot in the first block.

House and layout

The area of the house is 103.2 m². There are 2 floors, 3 living rooms and 2 bathrooms. The planning is designed for permanent residence of the family and separates the common daytime and private living areas.

For the standard section, an attic of about 47 m² with a wooden floor is provided. It can be used for storage or furnished within the technical capabilities of a particular house.

Structures and materials

The construction of the house provides for the solutions laid down for GREENBOR houses:

  • reinforced concrete strip foundation with a depth of 1.2 m and a reinforced concrete slab;
  • external walls made of StoneLight D500 gas block with a thickness of 375 mm;
  • internal brick walls;
  • reinforced concrete slabs of the first floor;
  • wooden beams of the upper floor;
  • metal profiled roof;
  • facade decoration with clinker tiles;
  • gravity ventilation and individual grounding;

The construction work in GREENBOR is carried out by a team Construction Group PNV. Quality control is carried out by the team Construction Audit by order of the project owners.

Electricity, water and other communications

Individually accounted connections to GREENBOR engineering systems are provided for homeowners:

  • up to 15 kW of three-phase electric power;
  • separate electric meter and accounting through ASKOE;
  • a separate pipe for household water supply;
  • control meter in the technical room and the meter in the house;
  • a separate technical water line for the land plot;
  • connection to the intra-quarter drainage system;
  • a separate rainwater and meltwater drainage system;
  • optical connection to the Internet.

GREENBOR gasification is not provided. Heating is organized on an electric basis according to the configuration of the house. The actual composition of the equipment and the readiness of connections will be recorded in the card and documents of the specific object.

Separate plot of land

The plot of 247 m² is the largest of the first phase townhouses and creates additional opportunities for a private yard and landscaping.

Land cadastral number: 3221484000:06:018:0608. Additional arrangement of the private territory — terrace, paving, lawn, landscaping, self-watering or canopy — is agreed upon separately.

House in GREENBOR compound

Automatic gates and a pedestrian gate, GSM access, a mobile application, two video surveillance cameras, two wells, a system of individual accounting of resources, water drainage and optical Internet are already working in the first line. The external approach is asphalted and lit, and the internal road and lighting are being installed in stages.

More about GREENBOR engineering systems and maintenance

Purchase status and conditions

The facility is under construction and may be available for viewing. Before registration, you can inspect the actual state of works, the land plot, project materials, and the current infrastructure of the first stage.

The current construction status and planned specification can be reviewed. Sale, paid reservation and payments are not available until legal readiness. Installment terms of completed duplexes do not apply to this object automatically.

The principle of a 10-year warranty is incorporated into the individual contract for the specific property. The contract defines the structures, works and equipment covered, together with the applicable warranty terms.

Review the construction status and book a viewing

What to check before registration

Before signing the documents, you need to compare the object card with the actual condition and check the area, cadastral number, equipment, engineering connections and the current status of the documentation.

View general GREENBOR documents · Find the house on the block plan